Concrete with 100% recycled aggregate including the sand fraction: test results
Hochschule München (HM) developed the concrete from recycled concrete aggregate (RCA, class AB16) of the Bayernkaserne demolition site in Munich, processed by Ettengruber, with 506 kg/m³ of a slag-based cement (Variocem W5). German standards do not cover such concrete, so its use at Campus Ost needed a special permission from the Bavarian building ministry.
• Strength: 55.8 N/mm² at 28 days and 60.4 N/mm² at 56 days (cube), above the target class C30/37.
• Stiffness and deformation: modulus of elasticity about 26 to 27 GPa; drying shrinkage 0.65 mm/m after 140 days and a creep coefficient of 1.22 after 35 days, within the typical range for recycled concrete.
• Workability: a full-scale test with a 40-metre pump; the slump-flow spread fell from 55 cm to 31 cm within 90 minutes.
• Durability: surface scaling of 122 g/m² after 56 freeze-thaw cycles, far below the 1,000 g/m² limit; moderate carbonation, with sufficient service life calculated for 45 years.
• Bond to reinforcing steel comparable to conventional concrete.
• Life-cycle assessment: about 285 kg CO₂ equivalent per m³, against about 211.5 kg for the natural-aggregate reference; the binder, not the aggregate, drives the footprint.
At Campus Ost the concrete went into bored piles, parts of the foundation, basement walls and one ceiling panel on the second floor.
• Munich pilot (https://cindeross.cinderela.eu/content/view/full/4558); Hochschule München in Business Finder (https://cindeross.cinderela.eu/content/view/full/4457); Ettengruber in Business Finder (https://cindeross.cinderela.eu/content/view/full/4463)
• Laboratory development: ReBuilt deliverable D.2.2.2, Report on tested green concrete solutions with 100% recycled aggregate and alternative binders (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.2.2.2-Report-on-tested-green-concrete-solutions-with-100-_-recycled-aggregate-and-alternative-binders.pdf)
• Source: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025.
• Source: ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026 (life-cycle assessment).
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).
• Strength: 55.8 N/mm² at 28 days and 60.4 N/mm² at 56 days (cube), above the target class C30/37.
• Stiffness and deformation: modulus of elasticity about 26 to 27 GPa; drying shrinkage 0.65 mm/m after 140 days and a creep coefficient of 1.22 after 35 days, within the typical range for recycled concrete.
• Workability: a full-scale test with a 40-metre pump; the slump-flow spread fell from 55 cm to 31 cm within 90 minutes.
• Durability: surface scaling of 122 g/m² after 56 freeze-thaw cycles, far below the 1,000 g/m² limit; moderate carbonation, with sufficient service life calculated for 45 years.
• Bond to reinforcing steel comparable to conventional concrete.
• Life-cycle assessment: about 285 kg CO₂ equivalent per m³, against about 211.5 kg for the natural-aggregate reference; the binder, not the aggregate, drives the footprint.
At Campus Ost the concrete went into bored piles, parts of the foundation, basement walls and one ceiling panel on the second floor.
• Munich pilot (https://cindeross.cinderela.eu/content/view/full/4558); Hochschule München in Business Finder (https://cindeross.cinderela.eu/content/view/full/4457); Ettengruber in Business Finder (https://cindeross.cinderela.eu/content/view/full/4463)
• Laboratory development: ReBuilt deliverable D.2.2.2, Report on tested green concrete solutions with 100% recycled aggregate and alternative binders (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.2.2.2-Report-on-tested-green-concrete-solutions-with-100-_-recycled-aggregate-and-alternative-binders.pdf)
• Source: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025.
• Source: ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026 (life-cycle assessment).
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).