Green Public Procurement criteria for office buildings prioritised by ReBuilt partners
In ReBuilt's review of Green Public Procurement (GPP), partners voted on which EU GPP criteria for office building design, construction and management national guidelines should include or strengthen. The seven criteria with most support are listed below in the report's order, each with its code in the EU criteria. Where the EU criteria set two levels, "core" is the basic level and "comprehensive" the more ambitious one.
1. Recycled content of construction products (B10.2): points for at least 15% by value of recycled content and by-products in the main building elements (core), or at least 30% including re-used content (comprehensive).
2. Competencies of the project manager (A1): experience in contracts with environmental performance requirements, in innovative environmental technologies and design, and in their financial appraisal.
3. Demolition waste audit and management plan (C1): a pre-demolition audit, and at least 55% by weight of non-hazardous demolition waste prepared for reuse, recycling or recovery (core), or 80% (comprehensive).
4. Energy supply systems (B4): connection to efficient alternative energy systems where the location allows it (core); at least 10% of primary energy demand from local renewable or efficient alternative sources (comprehensive).
5. Minimum energy performance (B1): calculated energy performance that meets the EU criteria for new buildings and major renovations.
6. Competencies of the design team (A2): proven expertise in energy-efficient design, building energy management systems, resource-efficient materials and staff travel plans. At comprehensive level this extends to building assessment schemes, life-cycle assessment (LCA) and life-cycle costing (LCC).
7. Building energy management system (B3): installed and commissioned, giving occupants and facility managers real-time data on energy use.
• See also, in Database > Legal: the Green Public Procurement review and the criteria for roads
• ReBuilt on CinderOSS, with the project's partners and matches: https://cindeross.cinderela.eu/content/view/full/4523
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See the ReBuilt project entry (https://cindeross.cinderela.eu/content/view/full/4391).
1. Recycled content of construction products (B10.2): points for at least 15% by value of recycled content and by-products in the main building elements (core), or at least 30% including re-used content (comprehensive).
2. Competencies of the project manager (A1): experience in contracts with environmental performance requirements, in innovative environmental technologies and design, and in their financial appraisal.
3. Demolition waste audit and management plan (C1): a pre-demolition audit, and at least 55% by weight of non-hazardous demolition waste prepared for reuse, recycling or recovery (core), or 80% (comprehensive).
4. Energy supply systems (B4): connection to efficient alternative energy systems where the location allows it (core); at least 10% of primary energy demand from local renewable or efficient alternative sources (comprehensive).
5. Minimum energy performance (B1): calculated energy performance that meets the EU criteria for new buildings and major renovations.
6. Competencies of the design team (A2): proven expertise in energy-efficient design, building energy management systems, resource-efficient materials and staff travel plans. At comprehensive level this extends to building assessment schemes, life-cycle assessment (LCA) and life-cycle costing (LCC).
7. Building energy management system (B3): installed and commissioned, giving occupants and facility managers real-time data on energy use.
• See also, in Database > Legal: the Green Public Procurement review and the criteria for roads
• ReBuilt on CinderOSS, with the project's partners and matches: https://cindeross.cinderela.eu/content/view/full/4523
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See the ReBuilt project entry (https://cindeross.cinderela.eu/content/view/full/4391).
Tuesday 10 November 2026