Green Public Procurement in construction: Czech Republic
In the Czech Republic, the Public Procurement Act (Act No. 134/2016 Coll.) has, since an amendment in force from 1 January 2021, obliged contracting authorities to follow environmentally responsible procurement where the nature and purpose of the contract allow it. The act lets them weigh environmental impact and life cycle, set environmental conditions for contract performance and require certificates.
The National Public Procurement Strategy 2024 to 2028 and the National Action Plan for Green Public Procurement (GPP) set goals, particularly for construction, with timelines and practical tools under development. Criteria sets, training programmes and good-practice databases are being prepared, and building information modelling (BIM) and life-cycle costing (LCC) are being introduced.
GPP remains largely voluntary. Its uptake is rising in EU-funded projects and in construction, but fewer than 1% of tenders include environmental criteria.
The report points to capacity gaps among contracting authorities, suppliers unprepared to meet green criteria, and the non-binding nature of most guidelines.
• Green Public Procurement review (https://cindeross.cinderela.eu/content/view/full/4524), with the criteria ReBuilt partners prioritised for office buildings (https://cindeross.cinderela.eu/content/view/full/4525) and roads (https://cindeross.cinderela.eu/content/view/full/4526)
• ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523)
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025, annex: national report for Czech Republic (version 1.0, August 2025). The annex has no public copy; the link opens the main report.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).
The National Public Procurement Strategy 2024 to 2028 and the National Action Plan for Green Public Procurement (GPP) set goals, particularly for construction, with timelines and practical tools under development. Criteria sets, training programmes and good-practice databases are being prepared, and building information modelling (BIM) and life-cycle costing (LCC) are being introduced.
GPP remains largely voluntary. Its uptake is rising in EU-funded projects and in construction, but fewer than 1% of tenders include environmental criteria.
The report points to capacity gaps among contracting authorities, suppliers unprepared to meet green criteria, and the non-binding nature of most guidelines.
• Green Public Procurement review (https://cindeross.cinderela.eu/content/view/full/4524), with the criteria ReBuilt partners prioritised for office buildings (https://cindeross.cinderela.eu/content/view/full/4525) and roads (https://cindeross.cinderela.eu/content/view/full/4526)
• ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523)
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025, annex: national report for Czech Republic (version 1.0, August 2025). The annex has no public copy; the link opens the main report.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).