Green Public Procurement in construction: Italy
Italy makes Green Public Procurement (GPP) mandatory. The Public Contracts Code (Legislative Decree 36/2023, article 57(2)) requires contracting authorities to include the Minimum Environmental Criteria (Criteri Ambientali Minimi, CAM) in the technical specifications and contract clauses of relevant procurements, and article 108 requires the CAM to be considered in the award criteria as well. A corrective decree (Legislative Decree 209/2024) has since amended the code.
The National Action Plan for GPP, first adopted in 2008 and issued in a new edition in 2023, sets national objectives and identifies the priority categories for which the Ministry of the Environment and Energy Security defines and updates the CAM. Public bodies must plan their GPP actions, and application is monitored yearly.
For buildings, the CAM for building construction and renovation (Ministerial Decree of 11 October 2017, periodically updated) cover the whole building process, including minimum recycled content in the main construction materials, and draw on life-cycle assessment (LCA) and life-cycle costing (LCC). Building information modelling (BIM) is being adopted progressively in public procurement. Criteria for road construction and maintenance were in preparation at the time of the report, with the aim of widening the market for recycled aggregates.
Enforcement remains the weak point. No central body tracks compliance with the CAM, and no penalty applies specifically to their non-use, although a non-compliant procedure can be invalidated or lose its funding.
• Green Public Procurement review (https://cindeross.cinderela.eu/content/view/full/4524), with the criteria ReBuilt partners prioritised for office buildings (https://cindeross.cinderela.eu/content/view/full/4525) and roads (https://cindeross.cinderela.eu/content/view/full/4526)
• ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523)
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025, annex: national report for Italy (version 1.0, 22 May 2025). The annex has no public copy; the link opens the main report.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).
The National Action Plan for GPP, first adopted in 2008 and issued in a new edition in 2023, sets national objectives and identifies the priority categories for which the Ministry of the Environment and Energy Security defines and updates the CAM. Public bodies must plan their GPP actions, and application is monitored yearly.
For buildings, the CAM for building construction and renovation (Ministerial Decree of 11 October 2017, periodically updated) cover the whole building process, including minimum recycled content in the main construction materials, and draw on life-cycle assessment (LCA) and life-cycle costing (LCC). Building information modelling (BIM) is being adopted progressively in public procurement. Criteria for road construction and maintenance were in preparation at the time of the report, with the aim of widening the market for recycled aggregates.
Enforcement remains the weak point. No central body tracks compliance with the CAM, and no penalty applies specifically to their non-use, although a non-compliant procedure can be invalidated or lose its funding.
• Green Public Procurement review (https://cindeross.cinderela.eu/content/view/full/4524), with the criteria ReBuilt partners prioritised for office buildings (https://cindeross.cinderela.eu/content/view/full/4525) and roads (https://cindeross.cinderela.eu/content/view/full/4526)
• ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523)
• Source: ReBuilt deliverable D.3.1.1, Report on review of national Green Public Procurement (GPP) focused on construction and suggestions for new additions (https://www.interreg-central.eu/wp-content/uploads/2026/07/D.3.1.1-Report-on-review-of-national-GPPs-focused-on-construction-and-suggestions-for-new-additions.pdf), version 1.0, September 2025, annex: national report for Italy (version 1.0, 22 May 2025). The annex has no public copy; the link opens the main report.
• Published through the ReBuilt project (Interreg Central Europe, CE0100390). See ReBuilt on CinderOSS (https://cindeross.cinderela.eu/content/view/full/4523).
Tuesday 10 November 2026