Maribor pilot: hemp-lime acoustic panels at NIGRAD's Dogoše centre
The Slovenian ReBuilt pilot took place at NIGRAD's Dogoše centre near Maribor, a site where NIGRAD recovers construction waste into recycled aggregates. Hempstatic's hemp-lime acoustic panels (500 x 500 mm, 40 mm thick) were installed in two rooms of the pilot building: 9.5 m² on the ground floor and 4.5 m² on the first floor.
ZAG measured the rooms before and after installation (30 May and 8 July 2025, ISO 3382-2). The reverberation time fell by about 0.5 s at 500 Hz in both rooms, slightly better than the laboratory results predicted. How the panels are spaced and exposed proved to matter for the result.
Under Activity 2.5, project partners reviewed the pilot on 5 March 2026, and NIGRAD held an in-situ training and study visit at the centre on 12 March 2026, with 20 participants. The project foresees a Circular and Digital Construction Demo Center in Maribor.
Hempstatic's business model: https://cindeross.cinderela.eu/content/view/full/4193
NIGRAD in Business Finder: https://cindeross.cinderela.eu/content/view/full/4424
ReBuilt on CinderOSS: https://cindeross.cinderela.eu/content/view/full/4523
Sources: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025; ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026.
Published through the ReBuilt project (Interreg Central Europe, CE0100390).
ZAG measured the rooms before and after installation (30 May and 8 July 2025, ISO 3382-2). The reverberation time fell by about 0.5 s at 500 Hz in both rooms, slightly better than the laboratory results predicted. How the panels are spaced and exposed proved to matter for the result.
Under Activity 2.5, project partners reviewed the pilot on 5 March 2026, and NIGRAD held an in-situ training and study visit at the centre on 12 March 2026, with 20 participants. The project foresees a Circular and Digital Construction Demo Center in Maribor.
Hempstatic's business model: https://cindeross.cinderela.eu/content/view/full/4193
NIGRAD in Business Finder: https://cindeross.cinderela.eu/content/view/full/4424
ReBuilt on CinderOSS: https://cindeross.cinderela.eu/content/view/full/4523
Sources: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025; ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026.
Published through the ReBuilt project (Interreg Central Europe, CE0100390).