Munich pilot: concrete with 100% recycled aggregate at Campus Ost
In the German ReBuilt pilot, Hochschule München (HM) developed concrete with 100% recycled aggregate, including the sand fraction, from the Bayernkaserne demolition site in Munich, processed by Ettengruber. The City of Munich used it at its Campus Ost school, a climate-neutrality pilot project, under a project-specific approval (Zustimmung im Einzelfall, article 20 of the Bavarian Building Code), since German standards do not cover such concrete.
The concrete exceeded its target strength class C30/37 and passed a full-scale pumping test. It was used in bored piles, parts of the foundation, basement walls and one ceiling panel on the second floor, and the deflection of selected slabs is being monitored. A life-cycle analysis found that the binder, not the aggregate, drives the carbon footprint: about 285 kg CO2 equivalent per m³, against about 211.5 kg for the natural-aggregate reference.
Under Activity 2.5, project partners reviewed the pilot in Munich in October 2024. A study visit to Campus Ost followed on 4 December 2025, and an in-situ training at the processing site on 7 May 2026.
HM in Business Finder: https://cindeross.cinderela.eu/content/view/full/4457
Ettengruber in Business Finder: https://cindeross.cinderela.eu/content/view/full/4463
City of Munich Building Authority in Business Finder: https://cindeross.cinderela.eu/content/view/full/4464
ReBuilt on CinderOSS: https://cindeross.cinderela.eu/content/view/full/4523
Sources: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025; ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026.
Published through the ReBuilt project (Interreg Central Europe, CE0100390).
The concrete exceeded its target strength class C30/37 and passed a full-scale pumping test. It was used in bored piles, parts of the foundation, basement walls and one ceiling panel on the second floor, and the deflection of selected slabs is being monitored. A life-cycle analysis found that the binder, not the aggregate, drives the carbon footprint: about 285 kg CO2 equivalent per m³, against about 211.5 kg for the natural-aggregate reference.
Under Activity 2.5, project partners reviewed the pilot in Munich in October 2024. A study visit to Campus Ost followed on 4 December 2025, and an in-situ training at the processing site on 7 May 2026.
HM in Business Finder: https://cindeross.cinderela.eu/content/view/full/4457
Ettengruber in Business Finder: https://cindeross.cinderela.eu/content/view/full/4463
City of Munich Building Authority in Business Finder: https://cindeross.cinderela.eu/content/view/full/4464
ReBuilt on CinderOSS: https://cindeross.cinderela.eu/content/view/full/4523
Sources: ReBuilt deliverable D.2.2.4, Report on implementation of new circular products as a solution, version 4.0, 30 September 2025; ReBuilt deliverable D.2.5.1, Report on pilot visits and in-situ trainings, version 1.0, March 2026.
Published through the ReBuilt project (Interreg Central Europe, CE0100390).